B A U K U N S T
HOME                                              OVERVIEW                                        PROJECTS  
New Single - Family Residential (R-3 occ.)
2011                 566-568 3rd Lane, South San Francisco, CA
                            New 3-story duplex development on an infill lot with
                            William Liang, SE and project liason.

                            1720 Claremont, San Bruno, CA
                            New 2-story residence on a Glenview Fire Event, 5100 SF lot.

                            1646 Claremont, San Bruno, CA
                            New 2-story residence on a Glenview Fire Event, 5025 SF lot.


2010                 173 Marston, San Francisco, CA
                            New 2500 SF, 2-car garage residence on a 25' wide parcel
                            adjacent to CCSF campus.

                           1710 Claremont, San Bruno, CA
                           New 2-story residence on a Glenview Fire Event, 5100 SF lot.
                                                    
          
2009            
114 Fir, South San Francisco, CA
                            New 2500 SF, 2-car garage residence on a 50' x 90'
                            suburban parcel.


2007             
648 Commercial, South San Francisco, CA
                            Assisted owner with  re-design of non-conforming, field-error, front
                            setback. Original design by others. Resolution at the City Council
                            level.
                          
                           
59 Trinidad, Tiburon, CA
                            New 3500 SF waterfront speculative home in Marin County
                            jurisdiction. Contextual front facade and contemporary rear
                            facing bay. 80' deep pile foundation and steel framing.

                           
98th & MacArthur, Oakland, CA
                            2500 SF speculative residence on an upslope lot.
                            Obtained planning approval.

                           
Sneath Minor Subdivision, San Bruno, CA
                            (2) 2800 SF, 2-car garage residences on a sloped lot.
                            Project approved by city.

2006                 Custom Residence, Calbayog City, Western Samar, Philippines
                            135 SM custom residence designed by Baukunst.
                            Construction and production documentation
                            by Ramones Design, Manila, Philippines.

                           
1234 Montara, Montara, CA
                            2-phase project starting with a 15-car garage with a loft and
                            hydraulic auto lift.

2005                 Custom Residence, County of Kauai, HI
                            Co-designed with owner. Architect of Record by others.
                            Wrap-around lanai. Freestanding 4-car garage.

2004                633 Rockaway Beach, Pacifica, CA
                           Production and design development of an owner designed
                           custom residence.

2003               535 6th Street, Montara, CA
                          Production Architect for a custom 2650 SF home.
                          Co-designed with PKM Construction Co., Inc. and owners.

                          
552 Myrtle Street, Half Moon Bay, CA
                           Preparation of design review and construction document
                           package for a new dwelling on an R-2 zoned parcel.
                           For PKM Construction Co., Inc., designer/general contractor.

                          
201 Scenic Way, Pacifica, CA
                           Production for a private, custom, 2-story residence on a
                           down slope lot. Design by PKM Construction Co., Inc.

2000               112-116 Melville, Palo Alto, CA
                           Schematic design for an R-2 parcel in old Palo Alto.
                           Multiple design options with full basements. Front unit
                           to be a rental and the rear unit was to be occupied by the
                           owner. The rear unit concept revolved around a gallery space
                           for the owner's extensive art collection.